Runoff from fuel, chemicals, waste, vehicle work or contaminated ground needs a pollution-risk assessment before choosing an outlet.
Identify sources and pathways
Map substances, storage, handling, firewater, washdown, spills, rainfall exposure and routes to ground, sewer and watercourse. Separate clean water where appropriate.
Use a treatment train
Source control, roofing, containment, shut-off, silt removal, separators and other treatment may be required. An oil separator does not treat every contaminant or dissolved pollutant.
Prepare incident response
Label controls, train staff, hold suitable spill materials and record emergency contacts. Do not wash spills into a drain or bypass a containment system.
Related guides
Design and compliance boundary
This page provides general UK-oriented learning, not a site design, product approval or statement of legal compliance. Confirm the requirements for the relevant UK nation, planning authority, Lead Local Flood Authority, sewerage undertaker, highway authority and environmental regulator. Use current manufacturer information and competent design. Never enter a chamber, drain or confined space without the required competent system of work.