Use this review before products are ordered and again before construction.
Inputs
- Site survey is dated and traceable.
- Measured water flow, pressure and source levels are stated.
- Areas, levels, soils, planting and watering window are defined.
- Assumptions and missing information are visible.
Hydraulics
- Zone flows are calculated from exact outlets.
- Critical paths use section-by-section flows and internal diameters.
- Elevation, pipe, valve, fitting, filter and regulator losses are included.
- Pump curve and system duty are matched.
- Minimum and maximum pressure cases are checked.
- Surge, shut-off and source variation are considered.
Water and compliance
- Source permission and abstraction position are confirmed.
- Backflow risk and water-undertaker requirements are addressed.
- Non-potable pipework is identified.
- Water quality and treatment are appropriate to equipment and use.
Installation and safety
- Buried services and safe excavation plan are defined.
- Pipe, cable, crossings, thrust and access details are buildable.
- Electrical supply, isolation and competence boundaries are clear.
- Pressure testing and flushing methods are specified.
Operation and proof
- Controller schedule and protection logic are documented.
- Commissioning acceptance measurements are defined.
- Maintenance access, spares and winter procedure are planned.
- As-fitted drawings, training and handover are included.
Review outcome
Record approved, approved with actions, or revise and resubmit. Give every action an owner and closure evidence. A checklist tick without supporting calculation or document is not technical approval.
Related guides
Sources and limitations
This checklist supports review but is not technical approval. The final design must follow current manufacturer instructions, site risk assessments, legal duties, water-undertaker requirements and applicable standards. Relevant references include HSE HSG47, Water Regs UK backflow guidance and BS EN 805:2025.