Plan an irrigation project from site survey through design, installation, testing and handover. Choose your project stage below to find the measurements, checks and records needed for a maintainable system.
Choose the project stage
- Define the need: start with the site survey checklist and design brief and performance criteria.
- Measure the available water supply: use the flow and pressure measurement guide, water budget and watering window and water-quality route.
- Complete the hydraulic checks: calculate zone flow, check the critical hydraulic path and record assumptions before selecting equipment.
- Coordinate installation: use pipe-route planning, valve-box and manifold layout, controller station schedules, field-cable records and trenching guidance.
- Test and hand over: follow the pressure-testing and flushing plan, commissioning record and as-fitted and handover guide.
Commercial and asset records
Record the design requirements in the quotation scope and exclusions checklist, asset and equipment schedule, change-control record and operation and maintenance manual. Use these records to manage the project. Before recording or ordering a component, match its SKU, specification and connections to the design; a similar description is not enough to establish compatibility.
Operation and review
Use the planned maintenance schedule, service-visit report and fault evidence record. Review substantial design changes using the design review checklist.
Safety, responsibility and limitations
Project records support competent work but do not transfer legal or professional responsibility. Excavation, electrical work, pressure testing, water-supply protection and machinery work require the applicable UK-nation rules, current manufacturer instructions and competent people. The construction roles and records required by CDM depend on the project and dutyholder arrangement.