Runoff design begins with the surfaces that contribute water, not just the visible drain.
Map the catchment
Measure roofs, paving, roads, landscaped areas and any off-site flow that can enter. Record slopes, kerbs, thresholds and low points. Distinguish connected impermeable area from ground that genuinely infiltrates water.
Allow for changing conditions
Blockage, saturated soil, future paving, climate allowances and exceedance routes can change the effective flow. Do not reduce catchment area merely because a surface appears partly permeable.
Record the calculation
Keep area, runoff assumption, rainfall source, duration, return period and any climate allowance. A calculated peak flow without these inputs cannot be reviewed.
Related guides
Design and compliance boundary
This page provides general UK-oriented learning, not a site design, product approval or statement of legal compliance. Confirm the requirements for the relevant UK nation, planning authority, Lead Local Flood Authority, sewerage undertaker, highway authority and environmental regulator. Use current manufacturer information and competent design. Never enter a chamber, drain or confined space without the required competent system of work.