Drainage must remain accessible for inspection and blockage clearance without creating an unsafe entry risk.
Access follows layout
Provide suitable access at positions required by the approved design, including changes in direction or gradient, junctions, heads of runs and intervals governed by system layout and clearance method.
Chamber selection
Depth, pipe size, branch arrangement, loading and safe opening size affect whether a rodding eye, access fitting, inspection chamber or manhole is appropriate. Restricted-access covers are used at depth to deter entry.
Keep it serviceable
Set covers to finished level and loading class, form channels and benches correctly, prevent debris entry and leave enough safe space for intended equipment. Never enter a chamber unless a competent confined-space system specifically permits it.
Related guides
Important boundary
This is general UK-oriented guidance, not a drainage design or confirmation of compliance. Requirements differ across England, Wales, Scotland and Northern Ireland and may also depend on planning conditions, the approving body, sewerage undertaker, highway authority, environmental regulator, site risk and current standards. Use the approved design, current manufacturer instructions and competent advice. Never enter a drain, sewer or confined space.