Irrigation Scheduling Worked Example

This simplified example shows the arithmetic and the decisions that must remain visible.

Starting information

  • Area: 400 m².
  • Opening root-zone deficit: 12 mm.
  • Daily ETo: 3.5 mm.
  • Supported Kc for the stated condition: 0.8.
  • Measured rain: 2 mm, of which 1.5 mm is assessed effective.

Daily calculation

ETc = 3.5 × 0.8 = 2.8 mm. Closing deficit before irrigation = 12 + 2.8 − 1.5 = 13.3 mm.

If the managed refill target is 5 mm deficit, required net irrigation is 8.3 mm. Net root-zone volume = 8.3 L/m² × 400 m² = 3,320 L.

Convert net to gross carefully

If a justified application-efficiency estimate is 0.80, gross depth = 8.3 ÷ 0.80 = 10.375 mm, approximately 4,150 L over 400 m². Confirm this against measured application, runoff, system capacity and the watering window. The example does not supply a universal Kc, efficiency or trigger.

Related Irri Hub guides

Use this safely

This guide supports irrigation planning and observation. It does not replace a site-specific agronomic assessment, current product instructions, an abstraction licence, or professional advice where crop value, public safety or environmental risk is significant. Record whether figures are measured, estimated or taken from a published source.

Core sources

Return to Irri Hub