The critical path is the route that demands the greatest pump or source head under the relevant operating condition. It is not always the longest pipe.
Build the route
- Start at the source or pump duty point.
- Follow one complete route to a critical outlet.
- List every pipe section with its actual flow.
- Add valves, filters, regulators, backflow arrangements and fittings.
- Add elevation change.
- Add the residual pressure required at the outlet.
Head equation
Required source head = elevation head + pipe loss + component loss + required outlet head
Keep all terms in one unit, normally metres of water. For water near ordinary temperatures, 1 bar is approximately 10.2 m head, but use a consistent engineering conversion in controlled calculations.
Why flows change by section
A main feeding several laterals carries the combined downstream flow. After a branch, each section may carry less. Applying full zone flow to every pipe section overstates loss; applying one outlet flow to the whole route understates it.
Test more than one condition
- Highest and furthest outlet.
- Largest-flow zone.
- Lowest outlet and maximum pressure.
- Clean and dirty filter conditions.
- Minimum source level or inlet pressure.
Design record
Retain pipe internal diameters, roughness method, flow, length, fittings, water temperature assumption, loss and source data for every section. A result without its inputs cannot be checked later.
Related guides
Sources and limitations
This guide supports planning and record keeping. The final design must follow current manufacturer instructions, site risk assessments, legal duties, water-undertaker requirements and applicable standards. Relevant references include HSE HSG47, Water Regs UK backflow guidance and BS EN 805:2025.