Drainage Site Survey and Design Checklist

Do not set a drainage route until the source, destination, levels, ground and constraints are evidenced.

Survey record

  • Water type and contributing catchment.
  • Existing chambers, pipes, outfalls and ownership.
  • Invert and ground levels tied to a datum.
  • Ground, groundwater and contamination evidence.
  • Buildings, foundations, utilities, trees and access.
  • Flood history, surcharge and exceedance routes.
  • Required approvals and maintenance owner.

Before excavation

Obtain available service records, scan and mark services, inspect the route and use safe-digging practices. Private services may not appear on statutory plans.

Hold points

Require review before changing outfall, gradient, pipe size, bedding, chamber position or protection. Record departures before the work is covered.

Related guides

Important boundary

This is general UK-oriented guidance, not a drainage design or confirmation of compliance. Requirements differ across England, Wales, Scotland and Northern Ireland and may also depend on planning conditions, the approving body, sewerage undertaker, highway authority, environmental regulator, site risk and current standards. Use the approved design, current manufacturer instructions and competent advice. Never enter a drain, sewer or confined space.