Drainage Attenuation Storage Basics

Attenuation temporarily stores runoff and releases it at a controlled rate. It is not the same as infiltration.

Define inflow and outflow

Calculate inflow across required storms and durations, then apply the approved discharge limit and control behaviour. Storage is the maximum accumulated difference, including relevant allowances.

Use real storage volume

Account for pipe and crate voids, base and soffit levels, submerged outlets, sediment, freeboard and unusable volume. Check structural loading, groundwater flotation and safe overflow.

Plan for failure

Show what happens if the control blocks, the outlet surcharges or the storm exceeds design. Keep access for inspection and cleansing throughout the asset life.

Related guides

Design and compliance boundary

This page provides general UK-oriented learning, not a site design, product approval or statement of legal compliance. Confirm the requirements for the relevant UK nation, planning authority, Lead Local Flood Authority, sewerage undertaker, highway authority and environmental regulator. Use current manufacturer information and competent design. Never enter a chamber, drain or confined space without the required competent system of work.

Sources

Return to Irri Hub