Preserve evidence before jetting, excavating or changing levels.
Describe the failure
Record flooding or ponding location, weather, duration, affected assets, odour, colour, sediment, alarm state and recent works. Mark safe photographs on a plan.
Measure safely
Record accessible chamber levels, pump status and upstream or downstream observations without entering chambers. Use competent CCTV, tracing or testing where required.
Control changes
Record each intervention and result. Repeated clearance without identifying collapse, root entry, inadequate capacity, surcharge or unlawful connection can hide the underlying risk.
Related guides
Design and compliance boundary
This page provides general UK-oriented learning, not a site design, product approval or statement of legal compliance. Confirm the requirements for the relevant UK nation, planning authority, Lead Local Flood Authority, sewerage undertaker, highway authority and environmental regulator. Use current manufacturer information and competent design. Never enter a chamber, drain or confined space without the required competent system of work.