Testing should follow the pipe system, approved design and applicable standard, with results recorded before concealment.
Inspection and testing
Check line, level, joints, chambers, bedding and cleanliness. Use the specified air, water, leakage, flow or CCTV test only with competent control and suitable equipment. An air-test result alone does not prove correct gradient or an unobstructed route.
Commission the destination
Confirm water reaches the intended lawful outfall, infiltration feature or treatment system and does not surcharge, escape at joints or create unsafe flooding. Test pumps, alarms and controls where present.
Handover pack
Provide as-built drawings, invert schedule, photographs, product information, test results, approvals, maintenance plan and emergency contacts. Identify any unverified section or limitation rather than marking the whole system simply “passed”.
Related guides
Important boundary
This is general UK-oriented guidance, not a drainage design or confirmation of compliance. Requirements differ across England, Wales, Scotland and Northern Ireland and may also depend on planning conditions, the approving body, sewerage undertaker, highway authority, environmental regulator, site risk and current standards. Use the approved design, current manufacturer instructions and competent advice. Never enter a drain, sewer or confined space.