Commission drip irrigation before concealment or handover so pressure, flow, flushing and faults are evidenced.
Before operation
Confirm model, layout, connections, filters, regulation, valves, air-vacuum devices, flush points and safe outlet. Check that laterals are not kinked or crushed.
Measure the zone
Flush in the required sequence, then record inlet and representative remote pressure, total flow and visible outlet operation. Compare measured demand with the design schedule.
Handover
Provide the drawing, product data, settings, cleaning method, flushing route, maintenance triggers and repair method. Record any buried routes accurately.
Related Irri Hub guides
Design boundary
This is general UK-oriented irrigation guidance, not a site design or a substitute for the selected manufacturer’s current data. Confirm measured dynamic pressure, available flow, levels, water quality, soil, planting and local requirements. Do not mix figures from different product families. Electrical work and contaminated or non-potable water require the appropriate competent assessment.
Browse by brand Rain Bird · Hunter · Netafim