Soakaways and Infiltration Drainage

A soakaway must be sized from ground and groundwater evidence, catchment and design rainfall, not from a convenient crate count.

Prove infiltration suitability

Use the test and design method required by the approving body. Check seasonal groundwater, contamination, nearby foundations, roads, slopes, other infiltration systems and any protected groundwater constraints.

Important current cautions

Approved Document H states that infiltration is not always possible and includes restrictions such as proximity to buildings or roads and groundwater reaching the device. England’s national SuDS standards require at least 1 m of unsaturated ground between the base of a wholly infiltrating feature and the maximum likely groundwater level.

Design and maintenance

Provide pretreatment for silt, accessible inspection, a safe overflow or exceedance route where required, and a maintenance plan. A system that works clean on day one may fail if sediment reaches the storage or infiltration surface.

Related guides

Important boundary

This is general UK-oriented guidance, not a drainage design or confirmation of compliance. Requirements differ across England, Wales, Scotland and Northern Ireland and may also depend on planning conditions, the approving body, sewerage undertaker, highway authority, environmental regulator, site risk and current standards. Use the approved design, current manufacturer instructions and competent advice. Never enter a drain, sewer or confined space.

Core references