Drainage trenches combine excavation, collapse, buried-service, groundwater and pipe-installation risks.
Plan before digging
Follow the HSE sequence: plan the work, locate and identify buried services, then excavate safely. Verify private services and changes found on site.
Protect people and the work
Assess trench support, access, spoil placement, plant movement, groundwater and exclusion zones. Never rely on a shallow-looking trench being safe. Keep people away from suspended loads and unsupported faces.
Open-trench inspection
Check formation, bedding, levels, pipe condition, joints, sidefill, crossings and photographs before backfill. Prevent debris entering the drainage system.
Related guides
Important boundary
This is general UK-oriented guidance, not a drainage design or confirmation of compliance. Requirements differ across England, Wales, Scotland and Northern Ireland and may also depend on planning conditions, the approving body, sewerage undertaker, highway authority, environmental regulator, site risk and current standards. Use the approved design, current manufacturer instructions and competent advice. Never enter a drain, sewer or confined space.