Irrigation Controller Station Schedule

A station schedule connects the controller screen to the physical system. Without it, fault finding becomes guesswork.

Minimum fields

Field Example purpose
Controller and station Exact output being commanded.
Valve-box reference Physical location of the valve.
Area served Plain description understood by operators.
Outlet type Sprinkler, rotor, spray, dripline or other load.
Design flow and pressure Baseline for alarms and diagnosis.
Wire or decoder identity Field connection and test reference.
Programme Days, starts, runtime and seasonal adjustment.
Irrigation controller software showing a table of station identifiers, area labels and numeric fields
JK Irrigation photograph: controller software lists station identifiers, area labels, sprinkler series and numeric fields. The displayed schedule does not prove the current field wiring, hydraulic performance or approved programme.

Naming

Use short unique names that appear consistently on the controller, drawing, valve label and maintenance record. Avoid “Zone 1” alone where several controllers exist.

A panel label is not the complete schedule

Map each physical output to its controller station or decoder identity, valve-box reference, area served and software name. A label inside the panel helps an operator navigate the system, but cannot show every buried joint or prove the field connection is still correct. After a wiring or programme change, update the panel label, controlled digital schedule and drawing together under the same revision.

Runtime is not permanent

Record the design application rate and target depth separately from runtime. Seasonal adjustment, rainfall, soil condition and plant needs can change the required runtime.

Master valve and pump logic

Document start delays, overlap, pump start, master valve output, flow-sensor thresholds and what happens on a fault. Test each interlock rather than assuming the programmed state operates correctly.

Handover

Provide a printed or offline copy near the controller where suitable and retain the controlled digital version. Record the date and person approving each programme change.

Related guides

Sources and limitations

This guide supports planning and record keeping. The final design must follow current manufacturer instructions, site risk assessments, legal duties, water-undertaker requirements and applicable standards. Relevant references include HSE HSG47, Water Regs UK backflow guidance and BS EN 805:2025.