Scope: Low-voltage irrigation control and decoder records. Mains-voltage work remains outside this guide.
Cable schedule
- Cable type, conductor size and manufacturer.
- Controller, route, start and end points.
- Station, common and spare conductor identities.
- Decoder address, type and protected device where applicable.
- Joint reference, location and enclosure method.
- Measured test results and test conditions.
Record a decoder replacement before burial
Record the manufacturer, full model, factory label and actual programmed address where applicable, the station or solenoid served, joint reference, location and test result. Photograph old and new labels safely before the replacement is concealed, then update the controller, station schedule and drawing with the date and revision. Protect any private site information when sharing the record.
Rain Bird’s legacy Decoder System Manual describes factory-assigned addresses for its listed FD-series devices and separate programming names for the areas they serve. Some addresses in that system can be reprogrammed. This is an example of why the installed identity and software mapping matter; it does not establish compatibility of another decoder from its appearance.
Route design
Coordinate with water pipes, mains electricity, communications, drainage and other buried services. Follow required separation and crossing details. Provide mechanical protection where the risk assessment requires it.
Buried joints
Use the controller and cable manufacturer’s specified connection system for the environment. A connector described casually as “waterproof” may depend on conductor size, preparation, orientation, gel or resin, enclosure and installation technique.
Voltage drop
Long cable runs and simultaneous loads can reduce voltage at the solenoid or decoder. Calculate using the actual circuit length, conductor resistance, load current and permitted device voltage. Remember that a common conductor may carry combined return current.
Testing boundary
Record resistance, insulation or decoder tests only when performed with equipment suitable for the connected devices and by a competent person. Some electronic equipment can be damaged by an inappropriate test voltage.
As-fitted record
Locate joints by measured offsets, not memory. Photograph the open joint before burial and link the photograph to the drawing reference.
Cable and jointing examples
These live examples show the kinds of components that may appear on a field-cable schedule. They are not interchangeable: conductor material and size, insulation diameter, controller requirements, burial environment and the connector manufacturer’s installation method must all be checked.

Field-cable example
2-Core 2.5 mm² Irrigation Decoder Cable
Representative reference SKU IRRI-CABLE-250M is the 250 m drum. Record the installed length and retain the exact system approval.

Direct-burial joint example
3M Direct Bury Splice Kit DBR/Y-6
Representative individual kit SKU DBR/Y-6 1. Verify the wire range and complete installation method for the actual circuit.

Cable-connector example
3M 314 Waterproof Cable Connector
Catalogue reference SKU 31CM31401. Confirm conductor size, number of conductors, enclosure and environmental requirements.
See currently available cable and connection products · Read the low-voltage fault guide · Read the golf cable-rewire overview
Related guides
Browse by brand Rain Bird
Sources and limitations
This guide supports planning and record keeping. The final design must follow current manufacturer instructions, site risk assessments, legal duties, water-undertaker requirements and applicable standards. Relevant references include HSE HSG47, Water Regs UK backflow guidance and BS EN 805:2025.