Irrigation Scheduling Review Record

A review record turns programme changes into evidence that staff, contractors and engineers can follow.

Record the decision

  • Date, site, zone and reviewer.
  • Plant type, growth stage, soil and effective root depth.
  • Opening water-balance or sensor condition.
  • Weather period, rainfall and source.
  • Controller programme, seasonal percentage and overrides.
  • Measured application or zone flow where available.
  • Change made, reason and next review date.

Check outcome, not just operation

Inspect soil at depth, plant response, runoff, drainage and distribution. A controller completing its programme proves only that it ran, not that the right water reached the roots.

Escalation triggers

Investigate repeated disagreement between calculation and sensors, unexplained water use, persistent runoff, salinity symptoms, waterlogging, pump alarms or inability to remain within licence and watering-window constraints.

Related Irri Hub guides

Use this safely

This guide supports irrigation planning and observation. It does not replace a site-specific agronomic assessment, current product instructions, an abstraction licence, or professional advice where crop value, public safety or environmental risk is significant. Record whether figures are measured, estimated or taken from a published source.

Core sources

Return to Irri Hub