Good diagnosis preserves evidence. Record the system state before adjusting regulators, programmes, valves or pump controls.
Describe the fault precisely
- Which area, zone or asset is affected?
- Is the fault permanent or intermittent?
- When did it begin and what changed beforehand?
- Does it happen at start, during running, at shutdown or after rain?
- Can it be repeated safely?
Separate symptom groups
| Group | Evidence |
|---|---|
| Water unavailable | Source level, isolation, inlet pressure and upstream flow. |
| Low pressure | Static and running pressure, zone flow, filter differential and critical outlet. |
| Excess flow | Unexpected outlets, leaks, valve closure and measured zone demand. |
| Control fault | Programme, station command, sensor state, alarm and manual-valve result. |
| Pump fault | Nameplate, controller code, pressure, flow, noise and safe observations. |
Change one controlled variable
Where safe and permitted, make one defined check at a time and record the result. Multiple simultaneous adjustments can conceal the cause.
Evidence pack
- Marked-up plan and asset reference.
- Clear photographs without exposing live equipment.
- Pressure and flow readings with instrument and location.
- Controller screenshots or exact messages.
- Recent maintenance, weather and water-source changes.
Preserve the event before resetting
Before clearing an alarm or resetting equipment, safely photograph or export the exact message or code, timestamp, affected pump or zone and operating state. Record what happened immediately beforehand and whether it recurs. Keep the original record separate from your interpretation: an event history shows a sequence of reported events, but may not identify the initiating fault. Do not delay necessary isolation to collect evidence or repeatedly restart a pump that trips.
Stop conditions
Isolate and obtain competent help for electrical damage, repeated protective-device operation, uncontrolled pressure, flooding, contamination, unsafe excavation or any condition outside the operator’s competence.
Related guides
Sources and limitations
This guide supports planning and record keeping. The final design must follow current manufacturer instructions, site risk assessments, legal duties, water-undertaker requirements and applicable standards. Relevant references include HSE HSG47, Water Regs UK backflow guidance and BS EN 805:2025.